wroclaw, POLAND

Otter run in Wroclaw Zoo

Scope of work included underwater windows, piped tunnel with the diameter of 50 cm as well as large cylinder in the middle of the basin. A challenge was to deliver the cylinder as it was composed of two semi-archs and vertically glued on site.

The horizontal transport of the cylinder had to be made manually as treetops made using crane impossible. Therefore in the first part we had to use forklift and in the second we moved acrylic elements on steel rollers.

We have also made decor from the sprayed concrete.