Modular hall system for an exhibition
Exhibition in a modular hall system, using maximum prefabrications. Designed so that the assembly and commissioning of the exhibition will close in 90 days, from the day of entering the construction site. Acrylics have been optimized to use the manufacturer’s formats. The exhibition contains a two-storey tunnel, enclosed in a cylinder-shaped tank.